28 Nov 2018
+

Indian Head Park News

At last, we are excited to report that the new minimalist modern house at Indian Head Park is substantially complete!

In this case, we helped our client by conceptualizing and clearly communicating a comprehensive design vision inside and out.  In effect, this bold design leadership helped give client confidence to proceed forward with community approvals, building permits, and construction.

On Thanksgiving weekend, we were able to stop by for a visit to check-out the latest progress  Please check out the story here!

15 Nov 2018
+

Bridge House Construction Underway

Construction on Bridge House in Douglas, Michigan has commenced! 

In fact, concrete piers are now well underway.  Please check out the project page for progress photos.

HAUS’ comprehensive design process has clearly communicated design options and solutions for client review and approval. 

For that reason, client and construction team have less unknowns to worry about during the construction phase.

01 Jul 2018
+

Auto House

Vintage muscle cars  make themselves at home in this new Midcentury Modern auto house completed in the Lakeside Woods Neighborhood within the Traders Point on the northwest side of Indianapolis; one piece of a master plan to comprehensively update a 1950’s Mid-Mod property.

HAUS designed the structure to compliment the original residence in form and style.  Chiefly, garage provides abundant natural light for showcasing client collection while doubling as a party barn.

The new freestanding structure is what you see from the primary residence elevated open-concept living space, so it’s not just garage, but new property focal point.

01 Apr 2018
+

Easter at Clearwater

Easter at Clearwater is a bit cold and overcast, but client is excited about celebrating Easter 2018 with family and friends in her newly minted custom interior.  This project is the latest major renovation project that we have completed at Lake Clearwater.  Check out the project page for the story – we’ll be adding updates and project photography later in 2018 after the warm weather arrives and we are able to finish the exteriors.

11 Sep 2017
+

Copperwood – New Modern House 1

We are happy to report that Copperwood – New Modern House 1 has weathered its first year of occupancy.   Our clients for this brand-new design/build project have lived in the home since October 2016 and we are looking forward to being featured on the AIA Indianapolis Home Tour in late September 2017.  It’s always great to see old friends and meet new ones at the show, so we hope you’ll stop by for a visit!  Check out the project page for the story.

01 Sep 2017
+

Mid Mod Entry

Mid Mod Entry Wall frames entry and private moss garden in one move.  This Midcentury beauty has been completely enhanced inside and out.  Have a look at the project story here, and please visit later this year for planned fall 2017 photography!

08 Aug 2017
+

Sneak Peek

Here is a sneak peek of New Modern House Ditch located on Ditch Road north of 96th (a couple lots north of the big radio tower).  Owners have lived in the home since late 2016 and are settling-in.  Landscaping and furnishings are taking root and we look forward to sharing more in the coming months!

21 Jul 2017
+

Treesdale Carmel Modern

Our excellent clients at Treesdale Circle in Carmel are settling-in to their new modern home this summer having been in the home now for a little over a year.  We look forward to showcasing more of this home including future phases down the road, as this project was designed with the long-view in-mind for this young, growing family!

10 Jul 2017
+

Master Stair

This master stair was sculpted from original roof rafters that were salvaged from the roof demolition to create the new master suite at the Classic Irvington Modern Tudor project.  This shot is from the top looking down within the modern addition on the back of the home.  Stairs are open riser to allow light to pass through the addition north to south.  Acrylic guardrail cladding provides safety + diffused light to adjacent spaces.  Bars at landing prevent one from tumbling into yard.

20 May 2017
+

Midcentury Move In

Midcentury Move In is 95% complete – exterior hardscape, southside privacy fence, exterior painting, porch screens, and landscaping along with some interior odds-and-ends are all that remain.  Substantial completion has been achieved (this means the project is available for its intended use).  It’s an exciting time on West 81st Street!

03 May 2017
+

Construction Progress

We have a lot of projects underway with construction progress to report.  This project, New Modern House 3 located in Chicago, is coming along slowly but surely.  Original cement board siding has been substituted with brick masonry which is currently in-progress.  The original color palette remains intact and the dark colored brick was a nice choice.  Please check back for new updates as we try to keep up with all the new project news!

 

25 Apr 2017
+

Colonial Modern

New Colonial Modern home to break ground this summer 2017 in Towne Oak Estates, Carmel just north of Coxhill Gardens.  We have made efforts to stay within the spirit of the neighborhood covenants while offering our clients a touch of modern sophistication reflecting their personal tastes.  Front elevation is highlighted by a modern entry featuring wood-clad Puja/home office.  We will have the project page up-and-running soon, so please check back for updates – and a Vastu to you!

02 Apr 2017
+

Modern Entry

The modern entry at Treesdale is looking good this spring.  Landscaping and some other new enhancements are in-process.  The work often isn’t always 100% complete at move-in.  Sometimes getting moved-in is just the first milestone;  then from there, the finishing-touches continue.  Frequently, future phases are planned from the very beginning to anticipate evolving lifestyles and budgets.  We like to think of the design/construction process as more analogous to a marathon than sprint, so physical and emotional endurance is a valuable quality (for both the vendors and the clients).  The rewards of tailored living await you at the finish line!

08 Feb 2017
+

Keep Chopping Wood

Keep on chopping wood at Copperwood – client living the dream taking advantage of a warm February day – little farmhouse in the distance.  Check out the latest updates to the project page here.

This project was designed by HAUS and built by WERK | Building Modern, our sister construction management company.  It is interesting to compare the projects we build versus the ones we do not build.  This project is one of the most successful realizations of Architect’s design intent of all of our recent projects.  Design concepts and alternatives along the way received the benefit of Architect daily oversight and clear communication at each step of the process, which is a major benefit of direct collaboration between Architect, trade contractors, and Owner.  Direct, clear communication by less parties may also translate into less time, less cost, and higher quality.

13 Aug 2016
+

Midcentury Gut Job Underway

Check out progress on this Midcentury Gut Job at 81st/Springmill area.  We are really excited about this one – it is pretty much a total redo both inside and out!  Check out the latest updates on the project page.

23 Jul 2016
+

New Modern Entry Bridge Progress

New Modern Entry Bridge is progressing at Copperwood right on schedule.  Bridge spans the front clerestory bay lower level walkout which provides an abundance of natural light to the lower level.  Check out the project page for the latest comprehensive updates.  We are really looking forward to finishing the final details around mid-September 2016 on this New Modern Home in Zionsville.

07 Jul 2016
+

Infinity Pool

Infinity Pool has been poured in the rear private courtyard at our New Modern House Ditch Road project.  This unique project is progressing inside and out.  We are looking forward to project completion in late 2016.  Please check out the project page for the most current updates!